EU aid for states of emergency in the Republic of Serbia – electrical equipment


Project goal

The goal of the project is to provide security and lessen the risk of failure of electrical energy. The project will provide mobile electrical equipment – mobile transformer stations and systems of remote control for the operators of the systems of distribution, which will enable the EPS to maintain the stability of the distribution system.



The project consists of delivering the following equipment: mobile transformer stations 110/35kV, three mobile transformer stations 35/10kV and the remote surveillance system and the control of the distribution network of middle voltage on the territory of Elektrosrbija Kraljevo (in several different branches). 


Last updated: November 7, 2024, 16:38