Hydro-technical and dredging works at critical sectors on the Danube river in Serbia

What is it about?

It is necessary to execute hydro-technical and dredger works on all critical points down the Danube river flow in Serbia. Hydro-technical works consist of:

  • non-rooted groins
  • four ties
  • three chevrons 

The dredge works will be executed in 5 critical sectors.
Upon completion of these works, the conditions for sailing will be harmonized with the national policy, the recommendations of the Danube Commission and the development plans of the European Union in the area of traffic systems.



Last updated: December 23, 2024, 20:31