The Contractor "Consortium Institute "Mihajlo Pupin"" (Institute "Mihajlo Pupin" - Automatika, Netico Solutions Nis, Elektromontaza Kraljevo, Institute "Nikola Tesla" and Prointer Belgrade) finished the erection phase for the Lot 3: "Remote Supervision and Control System for
Medium Voltage Distribution Grid in the Area of "Elektrosrbija
Kraljevo"" on 13.01.2020., after the seven hundred twenty eight (728) working days.
The 4440 pieces of the equipment were delivered to Elektroprivreda Srbije from the donation of European Union during the project execution. The contractor installed and configured the equipment on three hundred eighty six (386) locations in six EPS branches, as follows: Cacak, Uzice, Krusevac, Kraljevo, Loznica and Jagodina. Sixteen (16) dispatch centers will remotely monitor and control three hundred fifty four (354) new points in medium voltage network. These new remotely supervise points will enable the faster reaction in emergency situations and generally faster localization of the malfunctions in the system. Malfunction fixing will be much faster and finally, end users will have less non-power time during the emergency situations.
Defect liability period started on 14.01.2020. and will lasts twelve (12) months. The Supervising Engineer, Gopa-intec Gmbh, is monitoring the system functionalities in defect liability period with the EPS experts and provide claims for corrections to the contractor if it is necessary.