Project activities
The purpose of the role of the engineer is to supervise the contractor "Emergency works on the reconstruction of the flood protection system - Mačva", which are defined by the project boundaries:
The service will include monitoring of construction site work to ensure that the project complies with the Client's requirements according to the stated design criteria and that the works are carried out in accordance with the Technical Specifications. The Engineer will operate in accordance with the work program required to be established by the Contractor and which must be approved by the Supervisor.
Project phases
The services provided by the Surveillance can be divided
into four main phases:
• Initial phase,
• Project implementation phase,
• Activities during the Guarantee Period (DNP) and
• Activities after DNP.